Case studies
Wylfa is a twin reactor power station which entered into the decommissioning phase in 2015, located on the north coast of the Isle of Anglesey between Amlwch and Holyhead in the northwest of Wales. The site is 20.8 hectares surrounded by grazing agricultural land and a Site of Special Scientific Interest.
Hackney Council appointed UK Power Networks Services to develop an EV transition strategy for its refuse collection fleet, which comprised approximately 160 vehicles, made up of Light Commercial Vehicles (LCV) and Heavy Goods Vehicles (HGV).
The Department for Transport commissioned Connected Places Catapult to create a roadmap that will enable the UK to transition to hydrogen and electric aviation.
Berkshire Local Enterprise Partnership (LEP) appointed UK Power Network Services to produce a report outlining the options for the LEP to support the delivery of the proposed electric vehicle and hydrogen hub.
Port of London Authority has committed to halving their carbon emissions within five years, aiming for a 60% reduction by 2025 to achieve Net Zero by 2040.
Ampaire is a technology company that is developing and flying, hybrid-electric aircrafts to propel the aviation industry to a decarbonised future.
Over the past 30 years, our team has continued to grow in size and ambition as we've supported Gatwick airport to identify new supplies, new connections and new renewable energy systems.
Celebrating 30 Years in Aviation with Heathrow Airport. Over three decades, our long-term partnership with Heathrow has remained a testament to collaboration and shared innovation when delivering airport excellence. From delivering Terminal 5 to attaining Carbon Trust Level 3, we have supported Heathrow to achieve some of their biggest milestones, and look forward to many more years of success.
For over 30 years, we've continued to operate and maintain Stansted Airport's advanced electricity network, working collaboratively with our client to enhance control, efficiency, and resilience of operations. We have supported Stansted's network expansion and sustainability gains with the development and implementation of their new terminal building, the integration of EV charging infrastructure and the installation of a new solar farm.
We worked with bp pulse to install 22 50kW rapid electric vehicle chargers below Park Lane in central London. The new chargers allow local taxis, private hire vehicles and fleets to electrify and reduce emissions in the capital.
We operate and maintain the electricity network for Canary Wharf’s multi-tenanted commercial and retail buildings: ensuring an uninterrupted, secure supply. Our portfolio includes eight commercial offices and five retail malls, including national or global headquarters for some of the world’s largest financial institutions.
We implemented new smart electric vehicle charging systems to power UPS’s central London delivery fleet for what is believed to be the first of its kind in the world on this scale.
As one of the UK’s most innovative and efficient deep-sea ports, Port of Tyne has developed a decarbonisation roadmap, with an ambition to reduce net greenhouse gas emissions to zero by 2030 and to electrify the entire port by 2040.