Background
The project addresses the requirement to upgrade the E&P infrastructure on the north and mid-Kent lines to meet the Train Operating Company’s (TOC’s) aspiration to run 12-car trains, increasing capacity by 20% from the current 10-car units.
Phase 1 enhances the infrastructure to cope with a limited number of 12-car Class 465 units on the lines between London and Gravesend, London and Hayes, and London and Sevenoaks. The works are designed to achieve a 7.5kA route setting.